Renovating the kitchen as the heart of the home
The kitchen tests every part of a project: circulation, water, electricity, light, storage and its relationship with the living room must work together every day.
What we coordinate
- Work zones and circulation
- Systems planning
- Floor and wall finish coordination
- General and task lighting
- Connection to living and dining areas
Layout comes before the model
Linear, corner, peninsula or island layouts depend on clearances, openings and working distances—not on a composition selected out of context.
Services decided in time
Water, power, lighting and extraction must be coordinated before finishes are installed.
One room or a shared space
Where kitchen and living area meet, materials, volumes and light create continuity while preserving distinct functions.
Frequently asked questions
Can the kitchen be opened onto the living room?
Often yes, subject to structural, systems, ventilation and regulatory checks.
When are the systems defined?
Before walls and finishes are closed, once the kitchen layout is sufficiently developed.
How much does a renovation in Sardinia cost?
A reliable figure requires the size, condition, systems, access, work and finish level of the actual property.
How long does a complete renovation take?
Duration depends on scale, complexity, technical checks and supply times. A programme is prepared once the project is defined.
Does EdoHouse provide one point of contact?
Yes. One contact coordinates communication and project phases from the initial assessment to handover.
